The one end of your gutter will be the highest point if the gutter length is running less than 35 feet. Downpipe will be installed at the lowest point. It will be received all the rainwater from the gutter and drain to the drainage system below. The slope of gutter will be good at 0.25 inch for every 11 feet of gutter length.
If your gutter is running more than 35 feet of gutter installation, you will have the highest point at the middle. The slope will lead to both ends of gutter. Again, downpipes will be there to receive the rainwater. You will find that the 0.25 inch slope for every 11 feet of the length is also working well in this case.
Your downpipe outlets are required to connect between downpipe and gutter. The gutter hangers are required. They will be attached with the walls, fascias or other structure members to hold the gutter firmly. You will need the gutter hangers at every 24 inches. The gutter end will be request at every ends.
This is the second step to do the GUttER InSTallatiON.